09-250 1733 office@kdcivil.co.nz
Stormwater Soakage Network Upgrade, Malvern Rd

Stormwater Soakage Network Upgrade, Malvern Rd

Stormwater Soakage Network Upgrade, Malvern Rd CONTACT US Malvern Rd Soakage Project involved the installation of 200m of 600mm dia perforated PE soakage pipe, within the carriageway and private properties. The outlet was constructed within Folwds Park which...
Stormwater Upgrade, Fourth Ave, Waiheke Island

Stormwater Upgrade, Fourth Ave, Waiheke Island

Stormwater Upgrade, Fourth Ave, Waiheke Island CONTACT US Located adjacent to one of Waiheke’s popular beaches, Onetangi, the Stormwater upgrade works along Fourth Avenue included open trenching of 360m of concrete stormwater pipe. Installation of 9 manholes and...
Sewer Separation, Davis Crescent, Newmarket

Sewer Separation, Davis Crescent, Newmarket

Sewer Separation, Davis Crescent, Newmarket CONTACT US A recent condition assessment survey of stormwater assets that drain into the Newmarket stream revealed that there is a combined sewer with a direct connection to the 600mm dia. stormwater pipe located behind two...
Millbrook Rd HDD

Millbrook Rd HDD

Millbrook Rd HDD CONTACT US The installation of new stormwater infrastructure across Millbrook Rd, from the catchpit within #40 to an outlet to Oratia Creek on the western side of Millbrook Rd. The contract works include installation of a 450mm dia SW line by open cut...
Sewer Diversion by HDD and Microtunnelling, South Lynn

Sewer Diversion by HDD and Microtunnelling, South Lynn

Sewer Diversion by HDD and Microtunnelling, South Lynn CONTACT US Combination Horizontal Directional Drilling & Microtunnelling – manhole depth 4-11metres. Works included: Installation of 797m of transmission pipeline (up to 450mm dia PE) via trenchless...