09-250 1733 office@kdcivil.co.nz

Stormwater Soakage Network Upgrade, Malvern Rd

Malvern Rd Soakage Project involved the installation of 200m of 600mm dia perforated PE soakage pipe, within the carriageway and private properties. The outlet was constructed within Folwds Park which incorporated 3 new 3m dia precast concrete manholes with 28 bore holes, and 1800mm dia Hynds First Defence Water Treatment Manhole.

This project was quite unique due to the presence of dense of basalt rock. Almost 900m3 of rock was removed using methods including, hydraulic breaking, pre-splitting drilling and rock blasting using auto-stem cartridges. Malvern Road achieved a high standard of stakeholder management and client satisfaction.

“I just want to say how wonderful and helpful all your staff have been during this time. They are always so friendly and obliging when I need to get in or out of my property. I really appreciate their professionalism at all times. ” – Malvern Rd Resident 14.07.20

$

Completed: July, 2020

$

Client: Auckland Council

$

Type: Stormwater Soakage

Get in touch. We're Auckland’s most experienced and capable infrastructure drainage contractors with long-term proven capability in undertaking and managing civil construction works in the Auckland region.

GET IN TOUCH