Stormwater Upgrade, Arahoe Rd
The project was situated in Arahoe Road and involved the installation of 91m of new stormwater main (525mm and 500mm in diameter), 3 new manholes and a field drain. The works also occurred within 2 properties in Hutchinson Avenue.
The works involved the installation of drainage infrastructure built to Auckland Council’s construction requirements utilising codes for pipeline construction and horizontal directional (all drilled pipes were PE100 SDR17)
Completed: Janary, 2020
Client: Auckland Council
Type: Stormwater Renewal