by kdcivil | Sep 24, 2020
Tomo Remediation, Lynn Reserve, Glenfield CONTACT US A large tomo began appearing in the recreational park at Lynn Reserve. After initial investigations, the source of the tomo occurred due to catastrophic collapse of the existing 1050dia steel culvert. The remedial...
by kdcivil | Sep 24, 2020
Millbrook Rd HDD CONTACT US The installation of new stormwater infrastructure across Millbrook Rd, from the catchpit within #40 to an outlet to Oratia Creek on the western side of Millbrook Rd. The contract works include installation of a 450mm dia SW line by open cut...
by kdcivil | Sep 24, 2020
Sewer Diversion by HDD and Microtunnelling, South Lynn CONTACT US Combination Horizontal Directional Drilling & Microtunnelling – manhole depth 4-11metres. Works included: Installation of 797m of transmission pipeline (up to 450mm dia PE) via trenchless...
by kdcivil | Sep 24, 2020
Stormwater Upgrade, Arahoe Rd CONTACT US The project was situated in Arahoe Road and involved the installation of 91m of new stormwater main (525mm and 500mm in diameter), 3 new manholes and a field drain. The works also occurred within 2 properties in Hutchinson...
by kdcivil | Sep 24, 2020
Utility Relocation Works for the City Rail Link CONTACT US As part of the enabling works for CRL Karangahape Road station we were engaged by J&R Contracting to install new sewer and stormwater pipes beneath the street and footpath in Beresford Square. The...
Recent Comments